Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
https://bayt.page.link/u1zT8rgvwwwjAivU9
Back to the job results

Formwork Inchrge

30+ days ago 2026/07/21
2 Open Positions
Construction & Building
Create a job alert for similar positions
Job alert turned off. You won’t receive updates for this search anymore.

Job description

Formwork In?Charge – High?Rise Residential Buildings (MIVAN & Conventional Formwork) – 5–12 Years Experience

The Formwork In?Charge is responsible for planning, managing, and overseeing all formwork operations in a high?rise residential building project. The role requires strong expertise in MIVAN Aluminium Formwork, as well as working knowledge of conventional, modular, and MS shuttering systems. The Formwork In?Charge ensures structural accuracy, safety, quality, and timely completion of floor cycle targets.


Key Responsibilities1. MIVAN Aluminium Formwork Management (Primary Responsibility)
  • Lead and control the complete MIVAN formwork cycle, including:
    • Shear walls
    • Column & core walls
    • Slabs & beams
    • Staircases & landings
    • Balconies and façade elements
  • Prepare MIVAN shuttering layouts, cycle plans, and panel sequencing.
  • Ensure correct alignment, level, plumb, and joint tightness before concreting.
  • Monitor daily MIVAN cycle performance and take corrective actions for delays.
  • Coordinate repair, maintenance, and safe handling of MIVAN panels to prolong lifespan.
2. Management of Other Formwork Systems (Secondary Responsibility)
  • Oversee conventional formworkfor:
    • Basements
    • Podiums
    • Ramps & retaining walls
    • Lift machine rooms
    • Terrace structures
  • Manage MS shuttering, plywood formwork, modular systems, and cuplock scaffolding.
  • Plan work for areas where MIVAN and conventional systems interface.
3. Technical Planning, Sequencing & Coordination
  • Develop daily/weekly/monthly formwork work fronts with the Planning and Structure teams.
  • Coordinate with reinforcement, MEP, and concrete teams to eliminate rework or delays.
  • Ensure all MEP sleeves, conduits, boxes, and inserts are fixed before shutter closure.
  • Review and interpret structural drawings, GFCs, and MIVAN shop drawings accurately.
  • Provide technical guidance to foremen, supervisors, and subcontractors.
4. Quality Assurance & Control
  • Conduct pre?pour and post?pour inspections, ensuring:
    • Dimension accuracy
    • Proper tie?rod spacing
    • Adequate support and props
    • Rigidity & stability of the shuttering
  • Prevent defects such as:
    • Honeycombing
    • Leakage
    • Bulging
    • Blowouts
    • Poor surface finish
  • Ensure adherence to project specifications, method statements, and IS standards.
5. Safety Leadership
  • Ensure total compliance with safety norms during:
    • Panel lifting & shifting
    • Shuttering erection and dismantling
    • Working at height
    • Scaffold and platform use
  • Conduct regular toolbox talks with teams.
  • Immediately address unsafe acts or site hazards.
6. Material, Inventory & Resource Management
  • Maintain updated records of:
    • MIVAN panels and accessories
    • Props, soldiers, beams
    • Pins, wedges, wall ties
    • Scaffolding materials
  • Plan material movement between floors to optimize cycle times.
  • Ensure cleaning, proper stacking, storage, and repair of formwork materials.
  • Monitor material wastage and enforce preventive measures.
7. Team Leadership & Execution Management
  • Lead teams of shuttering supervisors, foremen, carpenters, and helpers.
  • Allocate daily tasks, monitor productivity, and ensure effective workforce utilization.
  • Manage subcontractor performance and ensure compliance with quality and schedule.
8. Reporting & Documentation
  • Prepare and maintain:
    • Daily progress reports
    • MIVAN cycle time reports
    • Material movement logs
    • De?shuttering logs
    • Checklists and QA reports
  • Report delays, constraints, and technical issues to the Project Manager/Construction Manager.
Qualifications & Skills
  • B.E./B.Tech or Diploma in Civil Engineering.
  • 5–12 years of experience in formwork for high?rise residential buildings.
  • Minimum 5 years of mandatory hands?on experience in MIVAN Aluminium Formwork.
  • Strong understanding of:
    • MIVAN shop drawings & pour sequencing
    • Structural drawings and specifications
    • Conventional & modular formwork systems
    • Formwork safety practices
  • Excellent leadership, coordination, communication, and troubleshooting skills.
This job post has been translated by AI and may contain minor differences or errors.

You’ve reached the maximum limit of 15 job alerts. To create a new alert, please delete an existing one first.
Job alert created for this search. You’ll receive updates when new jobs match.
Are you sure you want to unapply?

You'll no longer be considered for this role and your application will be removed from the employer's inbox.